Skip to product information
Kitchen Utensil Rack 2PCS, 15.6” Pot & Pan Hanging Rack Wall Mount

Kitchen Utensil Rack 2PCS, 15.6” Pot & Pan Hanging Rack Wall Mount

$41.58

About this item

  • Space Saving. Wall mounted the racks within reach in your kitchen stove, so you can clear access to the cooking utensils you common need at your fingertips while you cook without getting them off the counter or drawers. Frees up your counter space for prepping meals rather than for storage.
  • Functional Design. The sliding hooks adopt a nested design, which can be rotated 360 degrees without falling and can be moved around for optimum placement. Declutter your kitchen with this streamlined appearance and practical rack, helping organize and keep cooking utensils handy.
  • Sturdy. Made of Heavy Duty 304 stainless steel, ensures sturdiness and longevity, won't get scratched easily, and is rustproof. The brushed finish surface is always as new and easy to clean. It can be used for organizing kitchen utensils, pans, spatulas, BBQ utensils, bathroom towels, brushes, clothes, etc.
  • Easy Installation. The package contains 2 rods with 7 hooks, 4 extra stainless steel S hooks, and all the necessary mounting hardware and instruction, with 6 steps to finish the installation. (we put two more fixing screws than you need in the parts package in case of any missing or damage).
  • Quality Assurance. If you have any issues with the racks, please do not hesitate to contact us. (NOTE: Each rack is 15.6 inches long, make sure it fits the size and quantity of your pots and pans before purchasing)

Product specifications

Material Stainless Steel
Color Brushed Finish
Special features Rust Resistant, Scratch Resistant
Dimensions 2.56"D x 15.55"W x 1.2"H
Shelf Type Sliding Shelf
Number of Shelves 2
Room Type Bathroom, Bedroom, Kitchen, Living Room
Mounting Type Wall Mount
Recommended Uses For Product Cookware
Shelf Weight Capacity 22 pounds
Indoor Outdoor Usage Indoor
Finish Types Brushed
Style Name 15.6in/2 Pack
Weight 16 ounces
Included Components Hardware
Number of Items 2
Number of Packs 2
Item Highlight 304 Stainless Steel Lid Cooking Utensil Hanger, 7 Sliding Hooks for Spatula Spoon, Measuring Cups, Coffee Mug, Space Saving
Unit Count 2 Count
Item Type Name Kitchen Utensil Rack

Before it earns a place

Check the space, setup, and reset.

Use the verified product details above together with the kitchen you have. A quick check now can prevent an awkward fit later.
  • Measure the usable area

    Record width, depth, and height at the narrowest points, not only the outer opening.

  • Leave working clearance

    Account for doors, drawers, plumbing, handles, and the way the product moves during use.

  • Review setup and care

    Confirm the installation method, supported surface, cleaning steps, and storage routine before checkout.